
Compared to the Varadero the Mito has a lot of fairing. The whole thing was a total mess. Luckily my good mate Tom came to the rescue and both of us got stuck into getting them sorted.

It has taken almost two days to get the fairing into a reasonable condition for spraying. As I am also working on the Cagiva Mito as both sets of fairing are being sprayed simultaneously.

At last we finally get a glimpse of what was going on behind the doors of the PeaceHaven Electric Vehicle Workshop for the past three weeks. Steve has been working hard with the organisers of the Isle of Mann TTXGP to get this bad boy running for the races.